Which drone inspections does your solar farm need?
A solar farm is inspected at three layers: the system, the module and the cell. Each layer finds different problems with different tools. Knowing which layers a decision needs is the first step to an inspection plan that answers the right question.Utility-scale PV inspection operates at three spatial layers: system (plant, inverter, string), module (front and rear of each module) and cell (electrical activity inside each module). Each layer has its own inspection methods, detection limits and outputs. This paper maps methods to layers and layers to asset decisions.
TitleThree Layers of Solar Inspection
Select a layer to replay its part of the zoom.
In brief
- No single inspection sees every defect. Each layer finds different problems.
- System: drone visual and infrared (IR) thermography. Module: front-and-rear daylight scan with a choice of cameras. Cell: drone electroluminescence (EL), converted to power loss.
- Each of the six classic tests in a plant's life, from site acceptance to damage evaluation, needs a different mix of layers.
Abstract Asset decisions on utility-scale PV plants depend on inspection evidence. The SolarPower Europe O&M Best Practice Guidelines name six classic tests across a plant's life: intermediate and final Site Acceptance Tests (SAT), annual maintenance, Technical Due Diligence (TDD), troubleshooting and damage evaluation. No single method resolves every defect class. We describe inspection at three layers. At the system layer, drone visual and infrared (IR) thermography localize offline strings, thermal anomalies and site-wide issues, following IEC TS 62446-3. At the module layer, a front-and-rear daylight scan images each module with a visual, thermal or daylight photoluminescence (PL) camera and reports dark cells, broken glass, module identity, rear glass breakage and hot MC4 connectors or junction boxes. At the cell layer, drone electroluminescence (EL) with a SWIR camera resolves cracks, soldering defects, inactive cells and bypass diode failures, following IEC TS 60904-13. A physics-based model referenced to on-site I-V measurements converts each EL image into module power loss, with about 1% RMSE in Pmax on a 20-module verification set. We map each test to the layers it requires and summarize conditions and limitations per method.
Why
Inspection exists to support a decision. The decision sets which defects matter, and the defects set which layer must be inspected.
Why · Six classic tests
Six classic tests, and the layers each needs.
The SolarPower Europe O&M Best Practice Guidelines describe six classic tests across a plant's life[5]. Pick one to see the layers and inspections it needs.
The SolarPower Europe O&M Best Practice Guidelines describe six main tests performed across the PV lifecycle[5]: the intermediate and final Site Acceptance Tests (SAT), annual maintenance, Technical Due Diligence (TDD), troubleshooting and damage evaluation. Select one to see who commissions it, the question it answers, and the layers and methods it requires. Scoping from the test avoids two common gaps: a thermography-only survey offered as evidence of module defects, and a cell-level campaign without the plant context needed for TDD.
Who and when
The asset owner, after installation is complete, in year 1 of the defects liability period (DLP).
The question
Was anything damaged during installation, and what is the plant's day-zero condition?
Who and when
The asset owner, at the end of the DLP in year 2, before the construction (EPC) contractor hands over to the owner or operator.
The question
Is the plant free from defects and operating as expected, including early defects such as cell cracks from transport and installation?
Who and when
The O&M contractor, every year of operation, at intervals set by manufacturer and O&M manuals.
The question
What wear and tear or emerging issues could affect output?
Who and when
A buyer, investor or lender, before an asset transaction or refinancing.
The question
What condition is the plant in, and which risks affect its value and future output?
Who and when
The O&M contractor, when monitoring shows a performance issue.
The question
What is the root cause, and which modules or components must be replaced?
Who and when
The asset owner, after a force majeure event such as a storm, hail, fire or flood.
The question
What was damaged, how badly, and what is needed to restore the plant?
System layer
- Drone visual (RGB) mapping
- Drone IR thermography
NeededAs neededNot usually needed
Module layer
- Front-and-rear daylight scan
- Visual, thermal or PL camera
NeededAs neededNot usually needed
Cell layer
- Drone EL
- EL to power loss, referenced to I-V
NeededAs neededNot usually needed
Exclude installation damage and set a day-zero baseline. All three layers are needed, so every later inspection is compared with one complete starting point: the plant, every module front and rear, and the cells inside them.
Confirm a defect-free plant before the EPC leaves. All three layers are needed: EL shows early cell defects, and the module scan shows damage from handling or cleaning robots, while the EPC can still be held to account.
Check condition at regular intervals. The system layer covers the whole plant; module and cell layers follow where the system survey finds anomalies.
Price hidden defects into the deal. All three layers are needed to value the plant: plant performance, the physical condition of modules, and losses inside them.
Find and replace what causes a performance drop. The system layer locates the affected strings, and the module scan identifies each module and its serial number for replacement. EL confirms the cause where IR and the module scan cannot show it.
Assess the damage and restore the plant. The module scan records physical damage front and rear, and EL shows hidden damage in modules that look intact. A system survey sets the extent of the affected area. The same evidence supports an insurance claim.
Tests from SolarPower Europe[5]; layer mapping from QE inspection scopes. Contract terms and insurer requirements set the final scope.
Why · Three scales
Defects live at three scales.
A tripped string affects a row. Broken glass affects one module. A crack can hide inside one cell. Each layer asks its own question.
Defects differ in spatial scale by several orders of magnitude, from an offline string spanning many modules to a crack within one cell. Inspection methods differ in the physical quantity they observe (reflected light, temperature, emitted luminescence) and in resolution. Layer and method must match the scale of the defect.
Is the plant producing what it should, and where is it losing energy?
Scale: whole site, inverters, strings and rows.
Is each module physically intact, front and rear?
Scale: one module, typically about 2.3 m long. Glass cracks can start at the frame near a clamp.
What is happening inside each module, and how much power is lost?
Scale: one cell, typically 18 to 21 cm wide (half-cut cells are half that in one direction).
Schematic. Typical sizes for current utility-scale modules.
Why · Coverage
No single method sees every defect.
Each method sees some defects and misses others. Good coverage comes from combining layers. The full coverage table is in the Technical version.
Each method observes one physical signal. IR thermography detects temperature differences caused by current mismatch or resistive heating. Visual imaging detects reflectance changes. EL detects radiative recombination, which maps local electrical activity. Defects that do not change the observed signal are invisible to that method. Coverage therefore requires a combination across layers.
| System layer | Module layer | Cell layer | |||
|---|---|---|---|---|---|
| Defect or question | Drone visual | Drone IR | Front-and-rear scan · visual, thermal | Front-and-rear scan · PL | Drone EL |
| Offline string or inverter outage | |||||
| Soiling, shading, vegetation | |||||
| Hotspots, overheated cells | |||||
| Broken front glass | |||||
| Rear glass breakage | |||||
| Hot MC4 connector or junction box | |||||
| Module identity (serial label) | |||||
| Dark or inactive cells | |||||
| Cell cracks | |||||
| Soldering and interconnect defects | |||||
| Bypass diode failure | |||||
| Power loss of each module, in watts | |||||
Detection depends on conditions, image resolution and defect severity. Daylight PL is new in the market; detection limits vary by supplier. Power loss per module requires EL with a quantification step (How · Step 4).
Technical note IR flags cracks only when they isolate enough cell area to cause measurable heating, so most cracks are missed in thermography. EL flags hot connectors only indirectly, if at all, because resistive heating at a contact does not change cell luminescence. Visual imaging resolves glass breakage and soiling but not electrical defects. The "half" ratings mark indications that should be confirmed with the primary method before they are used as evidence.
How
One step per layer, plus one on turning cell images into power loss.Four steps: one per layer, and one to turn cell images into power loss.
How · Step 1 · System layer
System layer: drone visual and infrared.
A drone maps the whole plant in daylight with photos and thermal images. Offline strings and faulty areas stand out on the thermal map.
The system layer combines drone visual (RGB) mapping and drone IR thermography under operating conditions. Current mismatch, open circuits and resistive faults change module temperature, so offline strings, bypass diode activation and hotspots appear as thermal anomalies on an orthomosaic of the site.
Visual (RGB)Infrared (IR)
Warmer row
Drone visual (RGB) mapping
A photo map of the whole site. Shows soiling, shading, vegetation, visible damage and layout.
Georeferenced orthomosaic. Resolves soiling, shading, vegetation, visible damage and the as-built layout.
Drone IR thermography
A thermal map of the whole site. Shows offline strings, hotspots and modules that run abnormally warm. Method per IEC TS 62446-3[2].
Radiometric thermal map. Localizes offline strings, hotspots and bypass diode activation; supports anomaly classification and an energy-loss estimate.
Finds
- Offline strings
- Hotspots
- Soiling and shading
- Visible damage
You receive
- Full-site thermal map
- Temperature readings
- Anomaly classes with pass or fail filters
- System-level energy-loss estimate
Technical note IEC TS 62446-3 sets the requirements for outdoor IR thermography of PV plants, including a minimum in-plane irradiance of 600 W/m² and stable weather during capture[2]. IR shows that a module is abnormal, not why; anomalies that matter for a claim are followed up at the module or cell layer. Image resolution on the ground limits the smallest feature that can be resolved, so flight height is set per objective.
How · Step 2 · Module layer
Module layer: front-and-rear daylight scan.
In one daylight survey, a drone images every module, front and rear. The camera is chosen for what needs to be found: visual, thermal or photoluminescence (PL).
A single autonomous daylight survey captures front and rear views of every module. The rear capture addresses defects not visible from above on bifacial and glass-glass modules and on trackers. The camera is chosen per objective: visual imaging for glass breakage and module identity, thermal imaging for hot MC4 connectors and junction boxes on the rear, and daylight photoluminescence (PL) for dark cells and cracked glass.



Visual camera
Front: broken glass, and the serial label that links each finding to its module. Rear: rear glass breakage.
Thermal camera
Rear: hot MC4 connectors and junction boxes, which are hidden from a camera above the modules.
Daylight PL camera New in the market
Front: dark cells and cracked glass. PL records the faint light that cells give off in sunlight.
Front view finds
- Dark cells (PL)
- Broken glass (visual)
- Module identity, serial label (visual)
Rear view finds
- Rear glass breakage (visual)
- Hot MC4 connectors and junction boxes (thermal)
Technical note The scan is captured in daylight under normal operation, with no electrical connection to the array. Module identity is read from the label in the image, so each result is linked to a serial number for claim records. Visual and thermal capture confirm physical integrity but do not resolve cracks that have not yet isolated cell area; that remains the role of EL at the cell layer. Daylight PL is an emerging option at this layer: excitation and signal separation differ by supplier, and detection limits should be confirmed per supplier before results are used as evidence. Rear capture requires clearance under the array, which depends on mounting height and row spacing.
How · Step 3 · Cell layer
Cell layer: drone electroluminescence.
At night, current is fed into the strings. Healthy cells then give off a faint light, like an LED. A special drone camera records this light. It is not a heat image. Cracks and damaged areas stay dark.
The cell layer uses electroluminescence (EL). Strings are put in forward bias, usually at night, and the cells emit near-infrared light from radiative recombination, with a peak near 1150 nm for crystalline silicon. A drone-mounted SWIR camera records the emission. Local intensity tracks local electrical activity, so cracks, interconnect failures and inactive areas appear dark.
Drone EL
An image of the light each module gives off while current flows through it. The most direct view of the cells. Method per IEC TS 60904-13[3].
SWIR imaging of each module under forward bias. Resolves the electrical state of every cell.
Finds
- Cell cracks
- Soldering defects
- Dark or inactive cells
- Bypass diode failure
- Backsheet scratch, soiling
You receive
- An EL image of every module
- Defect class per module
- Location on the site map
- Input for power-loss analysis
Strings are disconnected from the string inverter and energized one channel at a time through a QE switch box from a DC supply. Afterwards every string goes back to its original inverter input. Schematic.
A DC supply is clipped to the combiner box busbars. Pushing back one fuse at a time lights one string for the drone. Schematic.
A DC supply connects at the feeder end of the harness. Plugging back one inline fuse at a time lights one string for the drone. Schematic.
The central inverter is switched to EL mode and energizes every connected string at once, so the drone covers the whole inverter block in one flight. Schematic.
Drone EL needs current in the strings. On central inverter sites, current is injected at the combiner box or at the harness cable, or supplied by an inverter with an EL mode.
Technical note EL imaging of PV modules is described in IEC TS 60904-13[3]. In the field, strings are energized with an external power supply or through the inverter, and images are captured when ambient light is low enough for the SWIR signal to dominate. EL shows electrical activity, not temperature or physical integrity of glass and connectors, which is why it complements the system and module layers. Image intensity depends on injection current and camera settings, so a quantitative reading needs a reference (Step 4).
How · Step 4 · Cell layer, quantified
From a cell image to power loss in watts.
A claim or a valuation also needs how much power is lost. Each EL image is converted into a power-loss figure, calibrated against electrical (I-V) tests on a few modules[4].
A defect count does not state energy impact. A physics-based model converts each EL image into a per-cell loss map and a module power loss. The model is calibrated once per site on 5 to 10 modules measured with both EL and I-V, then applied to every module, with no further I-V needed.
EL image
Per-cell loss map
Module power loss
4.8%
from one EL image
Calibrate once, apply to every module
5 to 10 modules measured with EL and I-V. The model is then applied to every fielded module from one EL image each. More than 250,000 fielded modules analyzed this way.
Pmax accuracy vs I-V
About 1% RMSE, R² above 0.9, on a 20-module verification set.
Technical note The reference is the module maximum power (Pmax) from on-site I-V measurement, following the practice of IEC 61829[4]. Reported accuracy: Pmax RMSE about 1% and R² above 0.9 on a 20-module verification set; parameter uncertainties per site are not reported here. Calibration is repeated for each module type and injection condition. The method estimates electrical loss visible in EL; losses that do not change luminescence, such as soiling on the front glass at operating conditions, are outside its scope.
Result
A dashboard to explore every module, and an analysis report that states the findings.A dashboard to explore every module, an analysis report that states the findings, and a scoping checklist.
Result · Dashboard
The dashboard: one map for every inspection.
Every inspection is captured on one aligned map, where each module can be opened with its images and findings. The same rows look healthy in daylight, show a few hotspots in IR, and reveal many damaged cells in EL.
Outputs from all layers are registered to one georeferenced site map in the QE Client Portal. Each module carries its visual, IR and EL evidence, so a finding in one layer can be checked against the others and exported for claims and reports.
VisualIREL
Visual · physical condition. In daylight the modules look uniform. Broken glass, soiling or missing modules would show here.
IR · heat. A few hotspots stand out. They point to a cell, connection or bypass diode running hotter than its neighbors.
EL · inside the cells. Brightness varies module by module. Dark cells mark cracked or inactive areas. Darker whole modules can indicate lower current or degradation. The visual and IR views show neither.
Same rows, three views. What looks healthy in the visual and IR views can still carry cell damage in EL. Drag the dividers or pick a view.
The same rows in three registered views, from the QE Client Portal. Site features removed.
Result · Analysis report
The analysis report: what was found and what it means.
The report turns the images into findings a contract, a claim or a valuation can use: what was measured, which defects were found and where, how each module is rated, and what should be checked next.
The report turns the images into findings a contract, a claim or a valuation can use: what was measured, which defects were found and where, how each module is rated, and what should be checked next. The same deliverables serve all six classic tests[5], from site acceptance to damage evaluation.
Drone EL mapElectroluminescence Inspection Report
1 · Executive summary
Major defect classes
Each class with its share of measured modules, where it clusters and what to check next.
2 to 4 · Scope and method
What was measured, and how
- Modules counted, measured and not measured
- Limits of the method stated
- Current injection and imaging conditions
- Automated feature classification
- Every module traceable on the dashboard
5 · Findings by defect class
Example modules per class
For each class: the EL signature, how many modules, and the most likely cause.
5 · Module rating
Each module rated
PassMajorCritical
Each module is rated by the most severe defect it carries.
5 and 6 · By location, conclusions
Where defects cluster
Region ARegion B
- Patterns linked to handling, installation or production
- Field checks recommended where needed
Plus: module-level registers for each major classPlus: every finding linked to its module on the dashboard
Structure of a QE drone EL report, based on anonymized project reports. Bar lengths and shares are illustrative, not project values.
Result · For practitioners
Scoping checklist and terms.
How to scope an inspection
- Name the test: intermediate or final SAT, annual maintenance, TDD, troubleshooting or damage evaluation.
- Read the layers it needs from the six classic tests above.
- Check what evidence the counterparty accepts (images, serial numbers, power loss).
- Confirm site constraints: night access for EL, clearance for rear capture, irradiance window for IR.
- Obtain the design layout and as-built drawing for the site map.
- Agree a baseline so later campaigns can be compared module by module.
Terms used in this paper
- Inspection layer
- System, module or cell: the scale at which a defect is observed.
- Drone IR
- Infrared thermography from a drone, plant scale.
- Front-and-rear scan
- Daylight imaging of each module, front and rear.
- Drone EL
- Electroluminescence imaging from a drone, cell scale.
- Power loss
- Reduction in module Pmax, in percent or watts.
- Digital twin
- Site model of every module, string and tracker.
About this paper
Plan an inspection around your decision.
Quantified Energy inspects utility-scale PV plants at all three layers, with research roots at SERIS, the Solar Energy Research Institute of Singapore at NUS. If you are preparing an acceptance test, a transaction or a damage evaluation, we can help you scope the layers it needs.
Sources and standards
- [1]Quantified Energy, field data and analysis from QE inspection projects, 2026. Source of the field images, the test to layer mapping, the front-and-rear scan result classes and the EL to power loss figures. Company material, not peer reviewed.
- [2]IEC TS 62446-3:2017, "Photovoltaic (PV) systems: Requirements for testing, documentation and maintenance. Part 3: Photovoltaic modules and plants, outdoor infrared thermography."
- [3]IEC TS 60904-13:2018, "Photovoltaic devices. Part 13: Electroluminescence of photovoltaic modules."
- [4]IEC 61829:2015, "Photovoltaic (PV) array: On-site measurement of current-voltage characteristics."
- [5]SolarPower Europe, "Operation & Maintenance Best Practice Guidelines," Version 6.0, chapter "Common Tests and Inspections", p. 51: six main tests performed throughout the PV lifecycle. Figure "Maintenance schedules and typical tests" courtesy of Quantified Energy Labs, 2024. solarbestpractices.com.
Author: Quantified Energy Labs, Singapore. Field data: Quantified Energy drone surveys. Animations and schematics are illustrative.